Artificial Turf Maintenance Schedule: Daily to Annual Tasks

Use a practical daily, weekly, monthly and annual plan to manage brushing, infill, seams, drainage, equipment and safety.
Artificial turf is not maintenance-free. It requires a different, usually more predictable programme than natural grass. Regular care supports fibre recovery, even infill, open drainage and early repair before small defects become major failures.
Every operating day
- Remove glass, metal, stones and organic debris.
- Inspect infill movement at goals, penalty spots and entrances.
- Close any area with an open seam, loose line or sharp edge.
- Keep drainage outlets clear.
Weekly work
Brush the surface with equipment suitable for the turf system, adjusting frequency to playing hours. Use crossing patterns rather than operating in one direction continuously. Machine weight, brush stiffness and speed should follow the manufacturer’s guidance.
Monthly inspection
Measure infill at reference points and inspect seams and lines closely. Check fences, goals, benches and gates. Use system-approved cleaning methods for moss, vegetation or sticky contamination; uncontrolled solvents or aggressive pressure washing can damage the surface.
Quarterly and six-month tasks
Professional machinery can decompact, deep-brush and separate fine debris from infill. Observe drainage after rainfall and map low spots. High-use facilities may require shorter intervals.
Annual technical review
- Infill quantity and distribution map
- Fibre flattening and high-wear zones
- Seam and line integrity
- Surface levels and drainage
- Goal anchoring and perimeter safety
- Lighting, electrical panels and emergency access
- Renewal of performance tests where required
Create a maintenance record
Log the date, pitch hours, machine, operator, added infill and defects for every task. Photographic records reveal recurring problems. A mobile form or ERP maintenance module can assign work, track consumables and issue reminders.
Explore RHB Group’s maintenance machines and spare materials or request a field assessment.
Structure the renewal decision when maintenance is no longer enough
For widespread fibre loss, multiple seam failures, permanent deformation or infrastructure defects, compare repair, partial renewal and replacement. Use the artificial turf pitch renovation guide.