Multi-use surfaces

RHB Grass Hockey FIH 13

Review multi-use, school or training surfaces against the actual sports and operating scenario.

RHB Grass Hockey FIH 13 is an artificial-turf model considered for field-hockey projects seeking a short, uniform playing surface suited to ball roll and stick interaction. FIH and 13 in the product name do not by themselves establish current field or product certification; pile, yarn, backing, infill or irrigation arrangement, technical values and project compliance must be verified through the current data sheet, sample and any federation documentation required by the brief.

Hockey stick and ball beside a white line on short artificial turf with a hockey goal beyond

Selection and technical review

Define sports, user groups, dimensions, usage intensity, base, drainage and maintenance resources. Verify ball response, slip and impact requirements using documents for the selected turf, infill and support layers. Model terms such as Play Safe or FIH alone are not safety or federation approval.

Application and handover preparation

Plan markings, zones, equipment, rolls, seams and edge transitions together. Where children's areas require fall performance, turf alone is not sufficient; check test scope for the complete system. Match model, batch and maintenance documents to the project acceptance requirements.

Product and surface system questions

How are service life and warranty terms determined?

Service life depends on the selected product, usage intensity, climate, installation and maintenance. Request the written warranty duration and scope using the product code. This page does not promise a common service life or UV warranty for every product.

What evidence is needed for use in a children’s play area?

Suitability cannot be established from the turf appearance or product name alone. Intended use, the base, any impact-absorbing layer and infill must be assessed together. Request relevant test reports by product and system code; do not assume safety or compliance before the report scope is verified.

How is drainage assessed in wet conditions?

Drainage must be assessed using the selected surface’s water permeability together with the sub-base, slope and drainage outlets. Share the project location and existing base details to request the product datasheet and installation requirements. No universal promise of no ponding or a fixed drainage rate is made.

RHB Assistant · WhatsApp