Sea logistics

Project & Heavy-Lift Cargo

Plan full-container, consolidated and project cargo around the goods and the origin-to-destination operations.

Lifting plans, transport frames, vessel and port suitability, securing, route permits and site delivery are coordinated for non-containerised, oversized or heavy equipment. Approved technical drawings and centre-of-gravity data are required before execution.

Representative project-cargo operation lifting a heavy industrial module with a controlled sling arrangement

Selection and technical review

Provide dimensions, gross weight, packaging, stackability, origin and destination ports, cargo-ready date and delivery terms. Container or special-equipment selection requires carrier acceptance; out-of-gauge cargo also requires drawings, centre-of-gravity and lifting-point review.

Application and handover preparation

Track booking, port cut-offs, loading, document checks and destination release in one plan. Separate local charges, storage, waiting, insurance and unloading responsibilities in the written scope; sailing and transit times depend on the carrier's current schedule.

RHB Assistant · WhatsApp